Kitchen Remodeling Contractor
Pennsylvania
Full kitchen remodel in Moore? Our certified remodelers cover Moore, Pennsylvania. Renovations from $21900, cabinet replacements from $5475. Free estimate — call today.
Several kitchen remodel estimates requested this week in Moore
Moore Housing Data — ACS 2024
Homeowners
3,141
owner-occupied units
Ownership rate
92%
of households own their home
Single-family homes
83%
of housing units
Median household income
$89,668
annual (ACS estimate)
Hardwood, luxury vinyl plank, tile and laminate flooring installation by licensed Moore kitchen contractors. Proper subfloor prep, transitions and threshold work included. Heated floor systems available.
Cabinet door and drawer replacement with new veneered boxes by licensed Moore contractors. A cost-effective alternative to full cabinet replacement at 50-60% of the cost — great results when cabinet boxes are structurally sound.
Granite, quartz, marble, quartzite and laminate countertop fabrication and installation by certified Moore contractors. Templating, edge profiles, undermount sink cutouts and backsplash connections all included.
Dishwasher, range, refrigerator, microwave and hood vent installation by licensed Moore contractors. Proper electrical connections, gas line hookup (where applicable), and water line for ice makers and refrigerators.
Complete gut-to-finish kitchen renovation for Moore homes. Our licensed contractors handle demolition, structural changes, new cabinets, countertops, flooring, backsplash, appliance installation and all trades (plumbing, electrical, drywall). Most mid-size kitchens completed in 4-8 weeks.
Ceramic, porcelain, subway tile, mosaic and natural stone backsplash installation by licensed Moore kitchen contractors. Precise cuts around outlets, windows and under-cabinet lighting. Grout and caulk work guaranteed.
Stock, semi-custom and custom cabinet installation by licensed Moore kitchen contractors. We carry and install top brands — KraftMaid, Merillat, Waypoint and more. Proper leveling, shimming, crown molding and hardware included.
Custom kitchen island design and installation for Moore homes. Our contractors handle structural considerations, electrical for outlets and pendant lights, seating overhangs, and storage configuration. Permits included where required.
COST RANGE
Estimates based on kitchen size, material selections, scope of work and structural changes
Insurance tip: Most homeowner policies cover sudden damage. Ask your contractor about documentation to maximize your claim.
* Estimates for Moore, Pennsylvania. Final pricing after on-site assessment.
In Moore, most kitchen renovation budgets are set by two numbers: how much your house is worth, and whether you plan to live in it for years or just fix it up to sell. Moore’s median household income of $89,668 and a homeownership rate of 92.1% (U.S. Census Bureau, ACS 2024) both point to owners planning upgrades with a long horizon—not landlords flipping rentals. Your kitchen decisions should fit not only your budget but also the housing era: the older pre-1940 homes seen in neighboring Bethlehem and Easton often have cramped galley layouts, making modernization and wall reconfiguration common, while mid-80s colonials might only need new finishes.
The biggest mistake in kitchen remodeling is pricing a lower scope—just cabinets and counters—and then adding mid-project extras like removing a wall or moving the sink, which puts you in a higher cost band both for material and for labor. Below is what you can expect in the Moore market as of 2026:
| Scope | What's included | Duration | Price range |
|---|---|---|---|
| Full gut remodel, same layout | cabinets, counters, appliances, flooring, lighting, fixtures | 6–10 weeks | $31,000–$124,000 |
| Gut plus layout change | all of the above plus moved plumbing, electrical, walls | 10–16 weeks | $67,000–$124,000 |
| Cabinet replacement (stock to semi-custom) | remove and install cabinets, hardware, patching | 1–3 weeks | $7,200–$31,000 |
| Cabinet refacing | new doors and drawer fronts, veneer, hardware | 3–6 days | $7,200–$20,500 |
| Countertop replacement only | template, fabricate, install, reconnect sink | 1–3 weeks | $4,100–$16,500 |
| Kitchen flooring only | remove existing, install new flooring | 3–6 days | $5,200–$20,500 |
Estimates for a typical Moore kitchen. Cabinet grade and whether the layout changes move these figures more than square footage.
How you approach a kitchen renovation in Moore shapes your cost and stress as much as the material choices themselves. For most homeowners, the straightforward route is hiring a dedicated kitchen firm—what’s called “design-build.” You sign one contract, get design, cabinetry, and installation all from the same place, with the highest price but the simplest process. You’ll have the least effort and a single company accountable for the result.
Going through a general contractor is the middle path. Here, you (or a kitchen designer you hire) decide on the cabinets and finishes, then the general contractor manages the trades: demolition, carpentry, plumbing, electrical, floors, and more. It’s often less expensive than a design-build firm, but you need to stay involved on decisions and timing. Expect a fair amount of your evenings spent choosing, approving, and chasing options if you go this route.
The third way—owner-managed—means you directly hire each trade and run the scheduling yourself. This is the cheapest option on paper, but by far the most demanding. It’s not for anyone who works full-time or will need permits (triggered easily by electrical or structural work in Moore). Northampton County doesn’t have as many dedicated remodeling firms as nearby Allentown, making it harder to pull subcontractors together for a small, one-off job. If you aren’t ready to coordinate twelve shipments and six contractors, managing it yourself in this market can drag on for months and cost more in the end than hiring help.
Most Moore kitchen renovations start with a wish list, but they need a budget breakdown before making choices. Cabinetry is almost always the largest expense—often a third or more of a gut renovation—because it sets the look and function and drives much of the lead time. Labor is next, especially if you’re moving walls or reconfiguring plumbing and electrical. Countertops, appliances, flooring, lighting, and plumbing fixtures follow, and each one can swing depending on material and brand.
Two areas that get skipped in early estimates: contingency for hidden conditions (very real in Moore’s older homes) and soft costs like permits, design, delivery, and dumpster fees. You need both, especially in any kitchen built before 1980.
Put extra funds where they show: upgrading from vinyl to hardwood or from stock to semi-custom cabinets is worth it. Spending big on a professional-grade range but leaving outdated, low-end cabinets around it rarely pays back.
In Moore, based on the typical full gut remodel range of $31,000–$124,000, here’s how a practical kitchen budget breaks down:
| Category | Share of budget | Notes |
|---|---|---|
| Cabinetry | 25–35% | the largest line and the longest lead time |
| Labour and installation | 20–30% | rises sharply if the layout changes |
| Countertops | 8–15% | material choice drives the swing |
| Appliances | 10–20% | widest range of any category |
| Flooring | 5–10% | |
| Lighting and electrical | 5–10% | higher in older homes needing circuits |
| Plumbing and fixtures | 4–8% | |
| Permits, design, disposal | 3–6% | usually forgotten in early budgets |
| Contingency | 10–15% | not optional in a pre-1980 house |
One of the most common mistakes in a Moore kitchen renovation is picking cabinets first and appliances second. Cabinets are measured and built around the specific appliances you select, especially for refrigerators, dishwashers, and slide-in ranges. If you order cabinets before finalizing appliance models, you are almost guaranteed to face expensive change orders or end up with a fridge sticking out or a range that leaves a gap.
For example, standard-depth refrigerators extend well past counters, while counter-depth models sit nearly flush but cost more and offer less storage. Slide-in ranges require cabinetry built just so, while freestanding ranges are more forgiving. Choosing gas versus induction dictates both the electrical service (older Moore homes often need a panel upgrade for induction) and venting. Panel-ready dishwashers and refrigerators need exact cabinet openings and hinge clearances.
Range hoods raise another issue: Ducting to the exterior is always preferred for air quality and moisture control, especially with Pennsylvania’s winter climate. Recirculating hoods are a compromise you’ll notice.
Professional-grade appliances may offer build quality, but in many homes, you’re paying a premium mostly for looks and a name. Always check lead times—some refrigerators and ranges now take longer to arrive than cabinets do, so order both at the same time to avoid delays that can push back your entire project.
In Moore, whether you keep your kitchen layout or move walls is the cost cliff that drives the entire project. As long as plumbing, appliances, and electrical stay in the same spots, you’re in the basic cost band. But as soon as you move a sink, stove, or wall—even if it’s just a few feet—you trigger a jump. This isn’t a matter of a few hundred dollars; moving the layout typically puts you in the $67,000–$124,000 range, even for an average-size space.
Why so much? Relocating a drain line requires proper slope and, in homes with a concrete slab or finished lower level, getting that slope can mean opening ceilings or floors you didn’t plan to touch. Electrical is similar: new circuits to the range or oven may mean you need a new panel or at least a subpanel. Removing a wall to “open up” the kitchen almost always leads to the big question—is it load-bearing? If it is, you’ll need an engineer’s report and a municipal permit, which you should budget for both in money and in waiting time. Venting a new hood to the outside sometimes means cutting through brick or stone, which is not a simple or cheap job here.
Take a hard look at whether your current layout is truly unworkable or just dated. In Moore’s older housing stock, a mid-century galley kitchen might be cramped, but moving everything rarely pays for itself unless the whole space plan is wrong. Many owners spend five figures just to shift a sink four feet—think it through before ordering plans.
In Moore, and throughout Northampton County, you generally don’t need a permit for purely cosmetic changes—paint, cabinet refacing, new hardware, or even swapping out a countertop if you’re not moving the plumbing. However, as soon as you plan to add or move electrical circuits, shift plumbing, or alter a structural wall, you are in permit territory. For example, any kitchen renovation involving structural changes or new electrical circuits in Bethlehem requires a building permit, and plan review is required for projects that alter structural walls or add new electrical circuits.
For projects requiring a permit, inspections are serious business. In Bethlehem, for instance, municipal inspectors—not outside agencies—handle electrical inspections; this can mean a different standard and possible delays if you need to call for re-inspection. Skipping permits can bite you at resale, as any unpermitted work can come up in a buyer’s due diligence or create issues with insurance claims down the road.
The Pennsylvania Home Improvement Contractor (HIC) registration is required for any project over $500, and you should verify registration at hic.attorneygeneral.gov. All contractors with employees must carry workers’ compensation insurance, which you can confirm on the WCAIS system (wcais.pa.gov). And plumbers and electricians are licensed municipally, so check with your township’s code office for additional requirements. Don’t let anyone talk you into skipping the permit; it’s rarely worth the risk in the Moore market.
In Moore, most homeowners start demolition before fully understanding the sequence and timing of a kitchen renovation—a main source of frustration. Here’s how it really plays out: Your timeline starts with design and field measurement. You have to select cabinets and appliances before anything gets ordered. Cabinet lead times can stretch 8–14 weeks in Northampton County, sometimes longer for specific finishes or semi-custom options, and local supply is a bit tighter than in Allentown due to fewer dedicated remodeling firms. Don’t rip out your kitchen until your new cabinets are in the warehouse or on the truck.
Once demolition begins, expect 1–2 weeks to get to the “rough-in” stage, where plumbing, wiring, and any layout changes take place before inspections. After passed inspection, cabinets go in—usually a week for install, plus more for fine trimming in older, out-of-square homes. Countertops cannot even be templated until the cabinets are fully set and leveled. Fabricators come out, make a digital template, then go back to the shop for custom cutting. This gap is at least one week, but often 10–14 days, and is rarely discussed up front. Only after counters are installed can final plumbing, backsplashes, flooring, and trim-out begin.
If everything goes right and nothing is moved, a Moore kitchen can be completed in 6–10 weeks wall to wall. Add layout changes or run into a supply snag, and schedules shift fast. Plan to live with a temporary kitchen for longer than you think—and make all key material orders before the first cabinet comes off the wall.