Kitchen Remodeling Contractor
Pennsylvania
Looking for a certified remodeling contractor in Franklin, PA? Call now from our network of licensed contractors serving Franklin and surrounding county. No-obligation estimate — same-day availability.
Several kitchen remodel estimates requested this week in Franklin
Franklin Housing Data — ACS 2024
Homeowners
1,650
owner-occupied units
Ownership rate
71%
of households own their home
Single-family homes
64%
of housing units
Median household income
$71,142
annual (ACS estimate)
COST RANGE
Estimates based on kitchen size, material selections, scope of work and structural changes
Insurance tip: Most homeowner policies cover sudden damage. Ask your contractor about documentation to maximize your claim.
* Estimates for Franklin, Pennsylvania. Final pricing after on-site assessment.
Stock, semi-custom and custom cabinet installation by licensed Franklin kitchen contractors. We carry and install top brands — KraftMaid, Merillat, Waypoint and more. Proper leveling, shimming, crown molding and hardware included.
Custom kitchen island design and installation for Franklin homes. Our contractors handle structural considerations, electrical for outlets and pendant lights, seating overhangs, and storage configuration. Permits included where required.
Dishwasher, range, refrigerator, microwave and hood vent installation by licensed Franklin contractors. Proper electrical connections, gas line hookup (where applicable), and water line for ice makers and refrigerators.
Ceramic, porcelain, subway tile, mosaic and natural stone backsplash installation by licensed Franklin kitchen contractors. Precise cuts around outlets, windows and under-cabinet lighting. Grout and caulk work guaranteed.
Cabinet door and drawer replacement with new veneered boxes by licensed Franklin contractors. A cost-effective alternative to full cabinet replacement at 50-60% of the cost — great results when cabinet boxes are structurally sound.
Hardwood, luxury vinyl plank, tile and laminate flooring installation by licensed Franklin kitchen contractors. Proper subfloor prep, transitions and threshold work included. Heated floor systems available.
Granite, quartz, marble, quartzite and laminate countertop fabrication and installation by certified Franklin contractors. Templating, edge profiles, undermount sink cutouts and backsplash connections all included.
Complete gut-to-finish kitchen renovation for Franklin homes. Our licensed contractors handle demolition, structural changes, new cabinets, countertops, flooring, backsplash, appliance installation and all trades (plumbing, electrical, drywall). Most mid-size kitchens completed in 4-8 weeks.
In Franklin and the surrounding parts of Greene County, kitchen renovation pricing sits higher than many expect—and the gulf between scopes is real. With a median household income of $71,142 and a homeownership rate over 70% (U.S. Census Bureau, ACS 2024), most upgrades are being planned by owners deciding what’s worth it for their own household rather than for a quick flip. A 1930s home with its original kitchen will pose a different set of costs and headaches than a 1990s tract house. Most Franklin kitchens are in homes built before 1980, meaning it’s common to run into knob-and-tube wiring, wavy plaster, and the need for new circuits, all of which add cost not just to gut renovations but sometimes even to basic upgrades.
Most blown budgets come from planning for “cabinet replacement” and then specifying the work or finishes of a gut-to-studs, full-custom remodel. Run the numbers on the right tier from the beginning.
| Scope | What's included | Duration | Price range |
|---|---|---|---|
| Full gut remodel, same layout | cabinets, counters, appliances, flooring, lighting, fixtures | 6–10 weeks | $29,000–$116,500 |
| Gut plus layout change | all of the above plus moved plumbing, electrical, walls | 10–16 weeks | $63,000–$116,500 |
| Cabinet replacement (stock to semi-custom) | remove and install cabinets, hardware, patching | 1–3 weeks | $6,800–$29,000 |
| Cabinet refacing | new doors and drawer fronts, veneer, hardware | 3–6 days | $6,800–$19,500 |
| Countertop replacement only | template, fabricate, install, reconnect sink | 1–3 weeks | $3,900–$15,500 |
| Kitchen flooring only | remove existing, install new flooring | 3–6 days | $4,900–$19,500 |
Estimates for a typical Franklin kitchen. Cabinet grade and whether the layout changes move these figures more than square footage.
In Franklin Township and the rest of Greene County, kitchen projects follow the Pennsylvania Uniform Construction Code, based on the IRC. For most basic cosmetic work—painting, cabinet refacing, hardware swaps, or same-footprint countertop replacement—a permit is not usually required. If your project involves new appliance circuits, moving plumbing, removing a wall, or installing a new range hood with venting, you will likely need a permit, especially if you live in Waynesburg Borough where code enforcement is stricter. Structural changes—or anything that alters the kitchen layout—calls for a building permit and may trigger plan review.
Electrical work is commonly inspected by Middle Department Inspection Agency rather than the local township. That means electrical sign-off can take coordination, and standards are strictly enforced. For all contracts over $500, your contractor must hold Home Improvement Contractor registration from the Pennsylvania Office of Attorney General (verify at hic.attorneygeneral.gov). Workers' compensation is mandatory for any crew, and you can check status through the WCAIS system. Unpermitted or uninspected work can be flagged at resale—and lenders or future buyers may require costly corrections, so do not skip this step even if a contractor suggests it’s “never checked” in your area.
With more than half of Franklin’s homes predating 1980 and a substantial number built between 1900 and 1940, surprises behind the walls are the rule, not the exception. Expect to encounter out-of-plumb walls and sagging floors, which can make new cabinet installation a $300–$1,500 shimming and leveling effort. Knob-and-tube, two-wire, or other outdated wiring is common; bringing the kitchen up to code can add $3,900–$7,800 for a full rewiring. Galvanized supply pipes and cast-iron drains, if found, typically require at least partial replacement—budget $1,500–$6,800 depending on access. No insulation in exterior wall cavities is another recurring find during demolition, and correcting it can run $650–$1,500 more.
If the home was built before 1978, the federal EPA Lead Renovation, Repair and Painting (RRP) Rule applies. That means a lead-safe certified contractor and possible containment or clearance testing—usually adding $500–$2,000, but it depends on scope. Asbestos floor tiles from mid-century homes may also require abatement. Unpermitted handyman wiring, poor-quality additions, and Mickey Mouse plumbing come up more than anyone likes to admit in this cycle of homes.
Kitchen remodeling is a spectrum. Most confusion and sticker shock comes from not drawing boundaries clearly among these four tiers:
The real cost cliff is between gutting to the studs (tier three) and moving the layout (tier four). Moving a sink by two feet turns a $40,000 project into $70,000, because it pulls in plumbing, electrical, and permits. Decide your tier before calling contractors. Without knowing your tolerance for wall removal or moving appliances, no pro can give you a meaningful number. Many contractors either refuse to price undefined scopes or quote so conservatively that it scares off homeowners. Locking in what’s negotiable up front is the shortcut to a straight answer.
Franklin homeowners generally have three main options for kitchen renovations:
The thinner labor pool in Franklin means any delay in one trade can domino across weeks, especially if you’re managing it yourself. Anyone considering owner-management for a permit-heavy kitchen needs both time and a temperament for conflict. It is not a route to a painless or quick project.
Electrical is where most older Franklin kitchens see budgets derailed mid-project. Current code expects each kitchen to have at least two 20-amp small-appliance circuits serving counter outlets (both GFCI protected), dedicated circuits for dishwasher, disposal, and built-in microwave, and a 240-volt line for an electric range. Receptacle spacing rules require outlets every four feet along the countertop, and no point more than two feet from an outlet. Outlets cannot be above cooktops or sinks.
But most Greene County homes, especially those built 1900–1940, weren’t wired for modern kitchen loads and never had grounded outlets added. Knob-and-tube or early BX wiring is common, panels often have no room for new breakers, and some kitchens still share lighting and countertop receptacles. Once you open the walls, the inspector will expect upgrades to current code. This is mandatory—not optional—and can add $3,900–$7,800 to a remodel if the service needs expansion or major rework. Even late-1990s homes in this market are likely to have too few circuits for today’s code, especially if you’re adding a microwave or larger range. If your home predates 1980, set the electrical contingency at the high end.
Many Franklin homeowners expect a kitchen project to last a few weeks—until the reality of rural contractor scheduling and product logistics sets in. The workflow runs: design and measurements; cabinet selection, quote, and order (often 4–10 weeks lead time for semi-custom); demolition and rough-in for plumbing and electrical; rough inspection; cabinet installation; then and only then, the countertop is templated for fabrication.
This “dead week” after cabinet install is the single biggest schedule surprise—countertops cannot be measured or made before boxes are locked in place. Fabrication and install typically take another 2–3 weeks. Only after counters are in can you set the sink, backsplash, and final trim. Finish flooring may go in either before or after cabinets, depending on materials and installer preferences.
Cabinets and countertops are the critical path—delay there, and every trade after you sits idle. In Franklin, the contractor market is thin, and crews often juggle jobs across multiple counties, so even a small delay can stretch into a week or more before the next trade has an open window. Always order cabinetry before demo, never after. Storage and waiting is a smaller problem than a kitchen left gutted and empty for four weeks because the cabinets still haven’t arrived.
Every contractor who performs home improvement work above $500 in Pennsylvania, including Franklin, must be registered with the Pennsylvania Office of Attorney General as a Home Improvement Contractor. You can and should verify their registration at hic.attorneygeneral.gov—their number should match what’s on your written contract. For workers’ comp coverage, confirm via WCAIS (wcais.pa.gov), especially if the contractor has employees. If you’re hiring electrical, plumbing, or HVAC trades, check with your municipality to see if additional local licensing is required. No legitimate professional will resist showing proof. A legitimate kitchen company will give you references and a written contract up front. For a simple cabinet replacement, expect to pay between $6,800–$29,000 for registered, insured work.
The cheapest upgrades are cosmetic: painting cabinets, changing hardware, updating light fixtures, or installing a new backsplash without altering the layout. These transformations often don’t require permits and can revive a tired kitchen for a small fraction of a full remodel—in the neighborhood of $2,000–$5,000 if you do most work yourself, but higher with pro labor. Refacing cabinets, which means new doors, drawer fronts, and veneer on the existing boxes, averages $6,800–$19,500 in the Franklin market and avoids demo or changes to plumbing and electrical. Avoid moving appliances or opening walls, as these trigger higher costs and permitting.
Quotes in Franklin can be miles apart because of two things: unclear scope and uneven contractor availability. Homeowners often compare a basic cabinet swap to a full gut renovation—the price difference between those is huge, even in the same room. Second, Greene County’s relatively scarce contractor market means travel surcharges and busy schedules for Pittsburgh or Morgantown firms working out here. A full gut remodel in Franklin can be as little as $29,000 or as much as $116,500, mainly depending on scope changes, material grade, and the unknowns in old homes. Always ask for itemized bids and clarify what’s not included to avoid surprises.
During a Franklin kitchen remodel, most homeowners use a folding table or old countertop set up in a dining room or basement, plus a microwave, toaster oven, and mini fridge. Plan to wash dishes in a bathroom or basement sink for a few weeks. Some try to move a refrigerator to a nearby room, but measure doors before you commit. Dust protection is especially important in older homes—seal off the kitchen from the rest of the house with plastic sheeting, especially if there may be lead dust or asbestos from old materials. For a full gut remodel, lasting six to ten weeks and costing $29,000–$116,500, this setup helps you keep life running with less stress.
In Franklin remodels, there’s always a one to two week lull after cabinets go in and before counters are installed. That’s because countertops—especially quartz or granite—can’t be measured or fabricated until cabinets are anchored, heights confirmed, and every wall bump accounted for. This waiting period is often omitted from estimates, but in reality, local fabricators may have order backlogs or travel windows since Greene County is outside their core route. For a countertop replacement only, expect $3,900–$15,500 and factor in an added couple of weeks from template to install, regardless of project size.
Kitchen remodel prices in Franklin stretch from $6,800 for a basic cabinet replacement, up to $116,500 for a large, high-end full remodel with layout changes. Most projects land in the $29,000–$63,000 range for a typical gut-to-studs update in an average-sized pre-1980s home. The wide spread is due to house age (and what’s behind the walls), cabinet grade, and whether you’re moving plumbing or electrical. For the average homeowner in Franklin, with a median income of $71,142, that often means selectively combining DIY cosmetic upgrades with pro cabinet, counter, and electrical work.
Whether induction is worth it comes down to cooking style and budget for electrical upgrades. Induction ranges are more efficient, faster, and safer for homes with kids. However, older Franklin kitchens often lack the 240-volt line needed for electric or induction cooking, meaning an electrical upgrade may add $3,900–$7,800. If you already have the necessary wiring or are planning a gut remodel, it’s a great long-term bet. If you love to can or use oversized stockpots, gas is still king, but many owners are switching as more cookware becomes compatible, and gas supply in some rural areas can be unreliable.
Spend on upgrades that actually improve the daily experience—not bells and whistles that eat budget without adding long-term value. In Franklin, full custom cabinets or imported tile can quickly double your cost with little resale return compared to good semi-custom cabinets. Unless you’re in your forever home, it rarely pays to remove multiple walls or totally reengineer the layout. Even high-end appliances may be a waste if the wiring or venting isn’t upgraded to suit. Simple cabinet replacement, at $6,800–$29,000, brings the highest “bang for buck” value in most homes; beyond that, costs jump fast for diminishing returns.
Nearly all pre-1980 homes in Franklin and much of Greene County need some electrical updating to meet current code. Many still have knob-and-tube or ungrounded two-wire circuits, and kitchen circuits were rarely installed to handle microwave ovens, dishwashers, or today’s appliance load. If you are opening up walls for a remodel, the inspector will require you to bring all new work up to code, including GFCI protection and dedicated appliance circuits. Budget an additional $3,900–$7,800 for a full rewire, especially when the panel is at capacity or the service is outdated. This isn’t an upsell—it’s inescapable for safety and resale.